Phase 3, Symmetry Park Bicester, Morrell Way
Bicester, OX26 6GFThe Space
Build-to-suit opportunities available on Phase 3, Symmetry Park Bicester.
At a glance
Property Type | Industrial |
Tenure | To Let |
Size | 40,000 to 270,000 sq ft |
Rent | Rent on application |
Energy Performance Rating | Upon enquiry |
Bicester Village
27 mins
Bicester North
38 mins
Islip
120 mins
Tackley
143 mins
Chesham
483 mins
Amersham
508 mins
Chalfont and Latimer
544 mins
Reading
577 mins
Key Points
- Established logistics park
- Excellent access to M40 J9
- Building built to net zero carbon in construction
- BREEAM Very Good and above
- EV car charging
- Floor loading minimum 50kN/m2
- Available on a Build to Suit basis
Description
Extending to a total of 69 acres, Symmetry Park, Bicester has the capacity to deliver up to 963,000 sq ft of logistics floor space.
Phase 3 accommodates up to 270,000 sq ft of logistics floor space. For more information, download the masterplan below.
Phase 2: Unit D (60,000 sq ft) has been pre-let to DPD Group UK Ltd. The distribution hub is the first net zero carbon in construction building in the Tritax portfolio. Learn more here.
Phase 1: Unit A1 (88,000 sq ft) was pre-sold to Bentley Designs Ltd with Unit A2 (110,000 sq ft) developed speculatively and subsequently sold to Medline Services Ltd. Unit B (163,664 sq ft) was developed speculatively and let to Ocado Retail Ltd. Unit C (271,227 sq ft) was developed speculatively and let to Syncreon Technology UK Ltd (DP World Logistics).
We have made a significant commitment to the environment to deliver all new buildings to net zero carbon in construction. More information can be found here.
The Location
Strategically located close to junction 9 of the M40 (4 miles / 10 minutes), benefiting from direct frontage to the A41, with excellent access to London, Birmingham and the national motorway network.