Phase 4, Silverstone Park

Buckingham Road, Towcester, NN12 8TJ

The Space

6 ACRE PRIME SITE – MIXED USE DEVELOPMENT POTENTIAL

At a glance

Property Type Industrial
Tenure To Let
Size 7,549 to 24,638 sq ft
Business Rates Upon Enquiry
Service Charge n/a
Energy Performance Rating Upon enquiry

Wolverton
185 mins


Milton Keynes Central
217 mins


Kings Sutton
219 mins


Northampton
238 mins


Chesham
603 mins


Amersham
639 mins


Chalfont and Latimer
667 mins


Chorleywood
703 mins


Key Points

  • Three detached units (2100, 2110 and 2125) totalling 60,789 sq ft
  • Four terraced units (2130 – 2145) totalling 32,711 sq ft
  • PC Q1 2025
  • Fully serviced – access to 21 MVA power and gas
  • Loading of 50KN/m²
  • 8 m clear height to underside of haunch
  • Up to 32 m yard depth
  • Please visit the weblink to download your desired brochure

Description

Seeking planning consent for further development at Silverstone Park for companies looking to join our growing community.

Silverstone Park provides an ideal base for high-tech, R&D, engineering and industrial businesses looking to benefit from a central location.

The site is in a prime position, adjacent to the Silverstone Park Innovation Centre, and close to the main entrance to the world famous Silverstone GP Circuit.

The land is fully serviced and is suitable for hybrid style industrial units, with smart offices, nursery, gym and café. Units will provide a smart front entrance leading to flexible space for offices, training rooms and display, as well as loading doors providing access to double-height accommodation for workshop and storage.

Available area

The accommodation comprises of the following

Name sq ft sq m Availability
Unit - 2100 24,638 2,288.95 Available
Unit - 2110 16,492 1,532.16 Available
Unit - 2125 19,659 1,826.38 Available
Unit - 2130 8,018 744.90 Available
Unit - 2135 8,572 796.36 Available
Unit - 2140 8,572 796.36 Available
Unit - 2145 7,549 701.33 Available
Total 93,500 8,686.44

Specifications

Fully serviced – access to 21 MVA power and gas
Use classes include: R&D, light and general industrial, storage and distribution (B1b, B1c, B2 or B8)
Loading of 50KN/m²
Targeting EPC ‘A’ Rating
8 m clear height to underside of haunch
5 m high roller shutter door
Smart reception area with toilets and stairs leading to first floor
First floor offices fitted to CAT A
Up to 32 m yard depth
Allocated parking

Available Units

Units in this development provide flexibility and can be divided to enable a company to grow into the building over time:

Three detached units (2100, 2110 and 2125) totalling 60,789 sq ft and ranging in size from 16,492 sq ft to 24,638 sq ft
*Unit 2110 can be subdivided: Unit 2110 at 9,855 sq ft and Unit 2115 at 9,855 sq ft, when fitted with first floor
*Unit 2125 can be subdivided: Unit 2120 at 11,845 sq ft and Unit 2125 at 11,845 sq ft, when fitted with first floor

Four terraced units (2130 – 2145) totalling 32,711 sq ft and ranging in size from 7,549 sq ft to 8,572 sq ft
A new café will be located in Unit 2150 and a new gym in Unit 2155, each at 3,751 sq ft. There will be an outdoor seating area by the café and the gym will include all the latest equipment. In addition, the development will include a nursery for the convenience of occupiers and their employees.

£POA